Master-Bilt® Refrigeration News & Product Information


Refrigeration U: Installing Walk-In Panels In The Correct Order

When assembling a walk-in cooler or freezer, it’s necessary to follow a certain order. If your walk-in has a floor, that will usually be your starting point. But what about the wall, door and ceiling panels? To help with the proper order of construction, we created the diagram below which is shipped with all Master-Bilt walk-ins and is included in the installation manual.

 

Hint: If you don’t have a floor, you can skip the first four steps.

The proper order of installation for Master-Bilt walk-in panels.

Click or tap here to see a pdf version of this diagram.