
Master-Bilt® Refrigeration News & Product Information
Refrigeration U: Installing Walk-In Panels In The Correct Order
When assembling a walk-in cooler or freezer, it’s necessary to follow a certain order. If your walk-in has a floor, that will usually be your starting point. But what about the wall, door and ceiling panels? To help with the proper order of construction, we created the diagram below which is shipped with all Master-Bilt walk-ins and is included in the installation manual.
Hint: If you don’t have a floor, you can skip the first four steps.